A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)
BPTP Spacio
BPTP SpacioBPTP's SPACIO, Park Serene, Sector-37D, Gurgaon at an unbelievable price of Rs. 2650/- per sq ft. in Construction linked payment plan & at Rs 2795/ per sq ft....
 
Emaar MGF Palm Terrace Select
Palm Terrace SelectPalm Terraces Select, a part of the larger community of The Palm Drive is ideally located on the Golf Course Extension Road with easy access from the main road...
 
DLF Capital Greens-III
DLF Capital GreensAfter huge success of DLF Capital Greens Phase I & II, much awaited DLF Capital Greens Phase III is on anvil. ....
 
 
Residential Projects > DLF Express Greens, Gurgaon
Projects style
Premium Apartments
Location
Gurgaon
Projects Status
On booking process
 
 
 
Overview
   
  DLF's new residential project "Express Greens" in Sector - M1, Manesar, Gurgaon. A reflection of novel architecture, pleasing aesthetics and impressive designs.
 
  • Ideally located 500 meters from NH8 & very close to KMP Expressway
 
  • Existing populated area with all basic civic infrastructure viz. Water, electricity, roads
 
  • Opposite Manesar Industrial belt which includes Maruti Suzuki, Honda, Denso
Loc map
Express Greens
Site map
Express Greens
Specification
Proposed Specifications For Apatrments
FLOORS
Living/Dining & Passages & Lobby within Apartment Vitrified tiles.
Kitchen & Toilets Anti Skid Vitried Tiles
Bedrooms Laminated Wooden Floorings
Balcony Tarrzo Tiles / Ceramic Tiles
S. Room Grey Mosaic Cast in Situ/Tiles
WALLS
Living/Dining & Passages & Lobby within Apartment Acrylic Emulsion
Kitchen & Toilets Combination of ceramic tiles, oil bound distemper and/or Mirror
S. Room Toilet Combination of ceramic tiles / Oil bound distemper & mirror
CEILINGS
Ceilings Oil bound distemper
COUNTERS
Toilets & Kitchens Counter in Granite/Marble
FITTINGS & FIXTURES
Toilets & Kitchens Single Lever CP Fittings/ White Chinaware. Glass Shower partition only in Master Bath, Towel Rail / Ring (No bath tubs. Stainless Steel double bowl, single drain board kitchen sink.
S. Room Toilet Conventional CP Fittings / White Chinaware
DOORS & WINDOWS
Internal Door Polished painted frames made of hardwood. Entrance door - Teak Veneered & polished shutter / moulded skin door. Internal door - flush shutters / moulded skin door.
External Door Powder coated Aluminium
ELECTRICALS
Modular type switches and sockets, copper wiring (fittings like fans, light fixtures, geysers, appliances etc not provied). Back up power of 7-6 KVA/Apartment
CLUB FACILITIES
Multpurpose Room, swimming pool, Changes Rooms, Gymnasium & Library.
SECURITY SYSTEM

Proximity Card Access Control, CCTV for Basement Parking and Entrance Lobby at Ground Floor. Boom barriers at entry and exit of the complex and at entry and exit of the basement parking

Marble/Granite being natural materials have inherent characteristic of colour and grain variation.

 
 
Proposed Specifications For Town Houses &Independent Floors
FLOORS
Living/Dining & Passages & Lobby within Apartment Vitrfiied Tiles
Kitchen & Toilets Anti Skid Vitried Tiles
Bedrooms Imported Laminated Wooden Floorings
Balcony Tarrzo Tiles / Ceramic Tiles
S. Room Grey Mosaic Cast in Situ/Tiles
WALLS
Living/Dining & Passages & Lobby within Apartment Acrylic Emulsion
Kitchen & Toilets Combination of ceramic tiles, oil bound distemper and/or Mirror
S. Room Toilet Combination of ceramic tiles / Oil bound distemper & mirror
CEILINGS
Ceilings Oil bound distemper
COUNTERS
Toilets & Kitchens Counter in Granite/Marble
FITTINGS & FIXTURES
Toilets & Kitchens Single Lever CP Fittings/ White Chinaware. Glass Shower partition only in Master Bath, Towel Rail / Ring (No bath tubs. Stainless Steel double bowl, single drain board kitchen sink.
S. Room Toilet Conventional CP Fittings / White Chinaware
DOORS & WINDOWS
Internal Door Polished painted frames made of hardwood. Eentrance door - Teak Veneered & polished shutter / moulded skin door. Internal door - flush shutters / moulded skin door.
External Door Powder coated Aluminium
ELECTRICALS
Modular type switches and sockets, copper wiring (fittings like fans, light fixtures, geysers, appliances etc not provied). Back up power of 10 KVA/ Town Houses & Independent Floors.
CLUB FACILITIES
Multpurpose Room, swimming pool, Changes Rooms, Gymnasium & Library.
SECURITY SYSTEM

CCTV for Basement Parking and Entrance Lobby at Ground Floor. Boom barriers at entry and exit of the complex and at entry and exit of the basement parking

Marble/Granite being natural materials have inherent characteristic of colour and grain variation.

Price List
PRICES
As on date 26-08-2008
Basic Sale Price (Rate) Rs. 2650 psft
Cost of the Parking

3 lakhs

Preferential Location Charges (PLC)

As applicable

Infrastructural Development Charges & amp
External Development Charges (IDC+EDC) 
Rs.150/­ p.s.ft
Interest Bearing Maintenance Security
(IBMS)
Rs. 50/­p.s.ft.
Down Payment Rebate 
9%
DOWN PAYMENT PLAN
Size 1460, 1760, 1835 & 2125 sqft. Booking Amount Rs. 5 lakhs

On Application for Booking

Rs. 5 lakhs (Rs. 10 lakhs in case of Town House & Independent Floors)

Within 30 days of Booking   95% of Sale Price (Less)
a) Booking Amount
b) Down Payment Rebate
On Application of Occupation Certificate 2.5% of Sale Price
On receipt of Occupation Certificate 2.5% of Sale Price+IBMS+Stamp Duty & Registration Charges
TIME BOUND INTEREST­FREE INSTALLMENT ­ PAYMENT PLAN

On booking Rs.            

5 lacs (Rs. 10 lakhs in case of Town House & Independent Floors)
Within 2 months of booking 20% of the Sale Price (less booking amount)
Within 4 months Booking   7.5% of Sale Price
Within 6 months booking 7.5% of Sale Price
Within 9 months booking 7.5% of Sale Price
Within 12 months booking 7.5% of Sale Price
Within 15 months booking
7.5% of Sale Price
Within 18 months booking 7.5% of Sale Price
Within 21 months booking 10%% of Sale Price
Within 24 months booking 10% of Sale Price
Within 27 months booking 10% of Sale Price
On receipt of occupation certificate 5% ” + IBMS+Stamp Duty & Registration Charges
SALE PRICE OF UNIT (UNIT PRICE x SUPER AREA OF APARTMENT) + PREFERENTIAL LOCATION CHARGES + IDC+EDC+ COST OF PARKING (as applicable)
Note:-
  1. The Basic unit price is escalation free, but subject to revision/withdrawal without notice at Company's sole discretion.
  2. The rebate for early payment shall however be subject to change from time to time and is presently @ 11% p.a.
  3. Each Apartment would be provided with power backup of 6-7 KVA in Type I & II and Town Houses & Independent Floors would be provided with power backup of 10 KVA.
  4. One car parking alongwith Three Bedroom Apartment and Two car parking with Four Bedroom Apartment, Town Houses & Independent Floors is mandatory.
  5. The yearly simple interest payable on IBMS shall be determined by the company as per the applicable rates on Fixed Deposits accepted by State Bank of India at the close of each financial year on 31st March.
  6. Stamp duty & Registration charges shall be payable along with the last installment as applicable
  7. The Company would pay penalty to its customers @ Rs.5 per sq.ft. per month for any delay in handing over the product beyond the committed period of three years from the date of execution of agreement. Similarly, the customer would be liable to pay holding charge @ Rs.5/-per sq.ft. per month, if he fails to take possession within 30 days from the date of issue of occupation certificate.
  8. Attractive Housing Loan options available from various financial institutions
  9. Prices are effective as on date.
  10. Prices indicated above are subject to revision from time to time at the sole discretion of the company.
  11. Prices, terms and conditions stated herein are merely indicative with a view to acquaint the applicant and are not exhaustive. For detailed Terms and Conditions please refer to the Application Form and Apartment Buyer’s Agreement.
App Form
 
EMI
Area Conversion
 
Gurgaon Noida
Mohali Greater Noida
Encore Estate
 
Projects
DLF  EMAAR MGF UNITECH RAHEJA RAMPRASTHA VATIKA OTHER LUXURY APARTMENT
SamaTara Commonwealth Games    Village    2010  Nirvana Country 2 Shilas The Edge Towers  India Next BPTP Astaire Gardens
Capital Greens, Ph.- III The Palm Drive  Vistas Atharva The Atrium India Next
 (Bellevue Residences)
Ambience Caitriona
Capital Greens, Ph.- I Emerald Floors Premier Sunbreeze Vedanta The View City Homes IREO The Grand Arch
Capital Greens- II Emerald Estate The Residences Navodaya IREO Uptown
New Town Heights The Palm Springs Uniworld Garden II R Mall (Com)
Express Greens The Palm Square (Com) The Close
Park Place Digital Greens (Com) Fresco
The Belaire Palm Terraces Select Signature Tower - II       (Com)
The Magnolias
Home | About Us | Services | News Letter | Home Loan | FAQ's | Career | Bookmark us | Feedback | Contact Us | Disclaimer
Copyright © Sana Associates 2010