BPTP Spacio
BPTP's
SPACIO, Park Serene, Sector-37D, Gurgaon at an unbelievable price of Rs. 2650/-
per sq ft. in Construction linked payment plan & at Rs 2795/ per sq ft....
Emaar MGF Palm Terrace Select
Palm
Terraces Select, a part of the larger community of The Palm Drive is ideally located
on the Golf Course Extension Road with easy access from the main road...
DLF Capital Greens-III
After
huge success of DLF Capital Greens Phase I & II, much awaited DLF Capital Greens
Phase III is on anvil.
... .
Residential Projects > IREO Uptown, Gurgaon
Projects style
Premium Apartments
Location
Gurgaon
Projects Status
On booking process
Overview
Ireo brings the next level of living to Sector – 66.
Introducing ‘Ireo Uptown – Home to young dreams’. 3 side open (2,
3 & 4 BHK) apartments with 10 ft ceiling height to give a Villa-like
living experience. The Spacious balconies overlook
Lush landscaping, Club house and other Recreational
facilities. Some of the key features of the development are:
State-of-art “Variable Refrigerant Flow Technology” air conditioning (Built-in Cooling
and Heating capability) Modular kitchen Solid waste management Ample Storage Space
The standard features of the development are as under:
Earthquake Code Compliant; with Building Design to highest codal provisions for this zone Primary School, Kindergarden and Creche Rain Water Harvesting Convenience Shopping
Cohesive Urban Design to include roads, street furniture, street lighting, paving and signage Mini Theatre in the Club House Water Features within the Development 24/7 and 100 % Power back up
Solar heating Solar lighting for street lights Spacious Ground floor lobby‐fully air conditioned Wastewater Treatment Plant Separate flushing water pipes Gas piping fitted into each property Availability of shuttle bus service with covered bus stop to Metro and Ireocity Double basement car parking Wifi in Public Areas Fitted baths with contemporary modern fittings CCTV in basement and main entrance lobby for surveillance; perimeter security and intelligent access control system
Price List
PRICE LIST
Basic Price
Rs. 4500/- Per sq.ft.
External Development Charges (EDC)
Rs. 319 per sq. ft.
Infrastructure Development Charges (IDC)
Rs. 30 per sq. ft.
Preferential Location Charges (PLC)
As applicable
Car parking (per bay) (See note 2)
Rs. 3,00,000 ; (01) Covered
Rs. 5,00,000 ; (02) Covered (back to back)
Rs. 3,00,000 ; Additional
Club Membership fee
As applicable
Replacement Fund-cum-Maintenance Security (RFMS)
Rs. 50 per sq. ft.
Booking Amount
10% of Basic Sale Price
PLC CHARGES
1.
Single PLC
Rs.200 per sq ft
2.
Double PLC
Rs.300 per sq ft
3.
More than 2 PLC’s
Rs.400 per sq ft
PLC ATTRIBUTES
A.
Floor
G,1,2,3,15 & above
B.
Green/Landscape/ Lawn
As applicable
C.
Club/Pool
As applicable
NOTE:
Prices prevailing at the time of receipt of application for booking shall be applicable.
Mandatory Car parking(s):
One bay for apartments Two bays for Penthouse
External Development Charges (EDC) and Infrastructure Development Charges (IDC)
shall include interest and other incidental charges thereon as presently applicable,
but does not include any future upward revision by the Haryana Government,
Which shall be payment at that time by the Applicant.
PAYMETN SCHEDULE
DOWN PAYMENT PLAN [7 ½ % rebate on Basic Sale Price + PLC + Parking]
S.N.
Linked Stages
Payment
1.
At the time of Booking
10 % of Basic Sale Price
2.
Within 45 days of booking
85 % of Basic Sale Price + EDC + IDC + PLC + Car parking
3.
On Receipt of Occupation Certificate
05 % of Basic Sale Price + RFMS + Stamp duty & Registration charges
CONSTRUCTION LINKED PAYMENT PLAN*
S.N.
Linked Stage
Payment
1.
At the time of Booking
10% of Basic Sale Price
2.
Within 45 days of Booking
10% of Basic Sale Price
3.
On Commencement of excavation
10 % of Basic Sale Price + 50% EDC + 50% IDC
4.
On completion of GF floor roof slab
7.5 % of Basic Sale Price + 30% EDC + 30% IDC
5.
On completion of 3rd floor roof slab
7.5 % of Basic Sale Price + 20% EDC + 20% IDC + 50% PLC
6.
On completion of 8th floor roof slab
7.5 % of Basic Sale Price + 50% PLC
7.
On completion of 11th floor roof slab
7.5 % of Basic Sale Price + 50% Car parking
8.
On completion of 14th floor roof slab
7.5 % of Basic Sale Price + 50% Car parking
9.
On completion of 17th floor roof slab
7.5 % of Basic Sale Price
10.
On completion of top floor roof slab
7.5 % of Basic Sales Price
11.
On completion of external plaster
7.5 % of Basic Sales Price
12.
On completion of internal plaster
05 % of Basic Sales Price
13.
On Receipt of Occupation Certificate
05 % of Basic Sale Price + RFMS + Stamp duty & Registration charges
* Stage for each installment shall pertain to stage for the respective Tower.
NOTE:
External Development Charges (EDC) and Infrastructure Development Charges (IDC)
shall include interest and other incidental charges thereon as presently applicable,
but does not include any future upward revision by the Haryana Government, which
shall be payable at that time by the Applicant. Stamp Duty/registration charges
shall be payable along with the last installment based on prevailing rates.
Prices subject to revision at the sole discretion of the company. Third party
charges including Govt. charges and taxes, if applicable, shall be extra. Club
membership fee, if applicable will be payable along with the last installment.
Gurgaon
Noida
Mohali
Greater Noida