A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)
BPTP Spacio
BPTP SpacioBPTP's SPACIO, Park Serene, Sector-37D, Gurgaon at an unbelievable price of Rs. 2650/- per sq ft. in Construction linked payment plan & at Rs 2795/ per sq ft....
 
Emaar MGF Palm Terrace Select
Palm Terrace SelectPalm Terraces Select, a part of the larger community of The Palm Drive is ideally located on the Golf Course Extension Road with easy access from the main road...
 
DLF Capital Greens-III
DLF Capital GreensAfter huge success of DLF Capital Greens Phase I & II, much awaited DLF Capital Greens Phase III is on anvil. ....
 
 
Residential Projects > Unitech Sunbreeze, Gurgaon
Unitech Sunbreeze
Projects style
Premium Apartments
Location
Gurgaon
Projects Status
On booking process
 
 
Overview
The airy home at Sunbreeze are designed expertly to let you  feel close to nature, even when you are indoors. As you take a walk along the landscaped greens in The outdoors, getready to lose yourself in the aura of nature's rhapsody to connect with your inner-self.     
A secret garden od experiences to be unreservedly savoured, Sunbreeze redefines the essence of an invigorating residential living.
Key Features
  • Gymnasium 
  • Multipurpose hall for meditation, Yoga & Gatherings 
  • Swimming Pool 
  • Changing Rooms
  • Kid's play area
  • Pantry
  • 24 x 7 Power Back-Up

 

Loc map
Key Plan
Master Plan
Spec
STRUCTURE
Structure RCC framed earthquake resistant structure
WALL FINISH
Internal Oil bound distemper
Srevant Quarter/Store Oil bound distemper
External Exterior paint
Lift Lobbies Combination of paint and stone/tiles
FLOORING
Living/Dining/Bedrooms Vitrified tiles
Sreavant Quarter/Store Ceramic tiles
Lift Lobbies Stone/Vitrified tiles
KITCHEN
Flooring Ceramic tiles
Dado Ceramic tiles till 600 mm above counter area, rest painted with oil bound distemper
Fitting Granite counter with stainless steel sink and drain board
DOORS
Main Entry Seasoned hardwood frame with European style moulded shutter
Internal Doors Seasoned hardwood frame with European style moulded shutter
TOILETS
Flooring Ceramic tiles
Dado  Select ceramic tiles upto 2100 mm
Fitting Granite counter, white sanitary fixtures, single lever CP fittings, pipe lines for geysers
BALCONIES
Flooring Ceramic tiles
Windows/External Door  Powder coated/anodised aluminium glazing
Electrical Copper electrical wiring in concealed conduits and modular switches
Power Back-Up 24 x 7 power back-up
Communication TV and telephone points in living room & master bedroom only intercom facility to each flat in living room
All floorplan, sitemap, specifications, amenities, facilities and perspective views are tentative in nature and are subject to revision.
 
Price List

PRICE LIST (w.e.f. 28-01-2010)

Basic Sale Price (BSP) for apartment sizes less than 2000 sq.ft  Rs. 3150/- Psf.
Basic Sale Price (BSP) for apartment sizes more than 2000 sq.ft  Rs. 2900/- psf.
Infrastructure Development Charges  Rs. 33/- psf.
Preferential Location Charges (PLC)
  • Single PLC : Rs. 100/- psf.
  • Two PLCs : Rs. 175/- psf.
  • Three PLCs : Rs. 250/- psf.
PLCs shall be charged for the following units
  • Ground Floor
  • First Floor
  • Second Floor
  • Corner
  • Landscape Facing
Interest Free Maintenance Security Deposit Rs. 50/- psf.
Within 150 days of allotment  10 % BSP
Car Parking Space
  • Covered : Rs. 2,50,000/- per parking
  • Open : Rs. 1,50,000/- per parking
Club Membership Registration Charges Rs. 60,000/-
  • Basic Price mentioned above are escalation free and exclusive of External Development Charges (EDC), Infrastructure Development Charges (IDC).
  • Any further increase in EDC and IDC by the Statutory Authorities shall be borne by the Allottee
  • The Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super Area for any delay in offering possession of the Apartment beyond the period of 36 months from the date of execution of the agreement to sell. Similarly, the allottee(s) would also be liable to pay holding charges @ Rs. 5/- per sq. ft. per month of Super Area if the allottee(s) fails to take possession of the Apartment within 30 days from the date of issuance of the notice of possession.
  • The Maintenance Charges on the basis of Super Area of the Apartment as determined by the Company at the time of offer of possession of the Apartment shall be payable in advance for a period of two years along with the notice of possession.
  • Parking: 2BR & 3BR – One covered car parking is mandatory 4 BR – Two covered car parking are mandatory
  • The above Prices / Payment Plans are subject to revision/withdrawal at any time without notice at the sole discretion of the Company.

PAYMENTS PLANS (W.E.F. 28-01-2010)

DOWN PAYMENTS PLANS (Rebate 10% on Basic Sale Price)
At the time of Registration of Application for Allotment 10% of BSP
Within 45 Days Of the date of Registration 85% of BSP +PLC + Parking + 50% of CMRC + EDC + IDC
On Notice Of Possession 5% of BSP + 50% of CMRC + Stamp duty charges and other charges as applicable
CONSTRUCTION LINKED INSTALLMENT PLAN
At the time of Registration of Application for Allotment 10% of BSP
Within 75 days of allotment 10% of BSP
Within 150 days of allotment 10% of BSP
On commencement of construction 10% of BSP + 50% of PLC + 25% of EDC & IDC
#On casting of Ground Floor Roof 10% BSP + 50% of PLC + 25% of EDC & IDC
On casting of Sixth Floor Roof 5% of BSP + 50% of Parking + 25% of EDC & IDC
On casting of Ninth Floor Roof 5% of BSP + 50% of Parking
On casting of Eleventh Floor Roof 5% of BSP
On casting of Top Floor Roof 5% of BSP
On completion of masonry work in the apartment 5% of BSP
On completion of internal plaster within the apartment 5% of BSP
On completion of flooring within apartment 5% of BSP
On notice of possession 5% of BSP + 50% of CMRC+ Stamp duty
BSP = Basic Sale Price,  EDC = External Development Charges,  CMRC = Club Membership and Registration Charges IDC = Infrastructure Development Charges , PLC = Preferential Location Charges
Other charges include Maintenance Security, Maintenance Charges, Stamp Duty Charges, Registration Fees and other charges payable as per the agreed terms
# This installment and installments listed hereunder shall become payable on demand irrespective of the serial order in which they are listed
E-Bro
App Form
 
EMI
Area Conversion
 
Gurgaon Noida
Mohali Greater Noida
Encore Estate
 
Projects
DLF  EMAAR MGF UNITECH RAHEJA RAMPRASTHA VATIKA OTHER LUXURY APARTMENT
SamaTara Commonwealth Games    Village    2010  Nirvana Country 2 Shilas The Edge Towers  India Next BPTP Astaire Gardens
Capital Greens, Ph.- III The Palm Drive  Vistas Atharva The Atrium India Next
 (Bellevue Residences)
Ambience Caitriona
Capital Greens, Ph.- I Emerald Floors Premier Sunbreeze Vedanta The View City Homes IREO The Grand Arch
Capital Greens- II Emerald Estate The Residences Navodaya IREO Uptown
New Town Heights The Palm Springs Uniworld Garden II R Mall (Com)
Express Greens The Palm Square (Com) The Close
Park Place Digital Greens (Com) Fresco
The Belaire Palm Terraces Select Signature Tower - II       (Com)
The Magnolias
Home | About Us | Services | News Letter | Home Loan | FAQ's | Career | Bookmark us | Feedback | Contact Us | Disclaimer
Copyright © Sana Associates 2010