A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)
BPTP Spacio
BPTP SpacioBPTP's SPACIO, Park Serene, Sector-37D, Gurgaon at an unbelievable price of Rs. 2650/- per sq ft. in Construction linked payment plan & at Rs 2795/ per sq ft....
 
Emaar MGF Palm Terrace Select
Palm Terrace SelectPalm Terraces Select, a part of the larger community of The Palm Drive is ideally located on the Golf Course Extension Road with easy access from the main road...
 
DLF Capital Greens-III
DLF Capital GreensAfter huge success of DLF Capital Greens Phase I & II, much awaited DLF Capital Greens Phase III is on anvil. ....
 
 
Residential Projects > Unitech The Residences, Gurgaon
The Residences
Projects style
Premium Apartments
Location
Gurgaon
Type of apartments
2 and 3 Bedroom
 
 
 
Location map
The Residences
Master Plan
The Residences
Key Plan
The Residences
Price List
 
Price List
w.e.f 22.04.09
Basic Sale Price(BSP) Rs. 3595/- per sq. ft.
Preferential Location Charges (PLC)
For Ground Floor Rs. 75/- per sq. ft.
For 1st Floor Rs. 60/- per sq. ft.
For 2nd Floor Rs. 50/- per sq. ft.
For Corner Rs. 50/- per sq. ft.
For Landscape Facing (applicable upto G+7th Floor) Rs. 50/- per sq. ft.
(applicable upto G+7th Floor)
Interest Free Maintenance Security Deposit Rs. 50/- per sq. ft.
Car Parking Space
Covered Rs. 1,90,000/- per parking
Open Rs. 1,15,000/- per parking
Club Membership Registration Charges Rs. 50,000/•
  • Basic Price mentioned above are escalation free and inclusive of External Development Charges (EDC) & Infrastructure Development Charges (IDC).
  • Any further increase in EDC and IDC by the Statutory Authorities shall be borne by the Allottee.
  • The Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super Area for any delay in offering possession of the Apartment beyond the period of 30 months from the date of execution of the agreement to sell. Similarly, the allottee(s) would also be liable to pay holding charges @ Rs. 5/- per sq. ft. per month of Super Area if the allottee(s) fails to take possession of the Apartment within 30 days from the date of issuance of the notice of possession.
  • The Maintenance Charges on the basis of Super Area of the Apartment as determined by the Company at the time of offer of possession of the Apartment shall be payable in advance for a period of two years before the Possession of the Apartment is offered to the Allottee(s).
  • Parking :
    1BR -  One covered car parking is mandatory
    2BR -  One covered car parking is mandatory
    3BR with SQ -  One covered and One open car parking is mandatory
  • The above Prices / Payment Plans are subject to revision/withdrawal at any time without notice at the sole discretion of the Company.

PAYMENT PLANS

w.e.f 22.04.09

 

DOWN PAYMENT PLAN

Rebate 10% on Basic Sale Price

At the time of Registration of Application for Allotment 10% of BSP
Within 45 Days Of the date of Registration 85% of BSP + PLC + Parking + 50% of CMRC
On Notice Of Possession 5% of BSP + 50% of CMRC + Stamp Duty Fees and other charges as applicable

CONSTRUCTION LINKED INSTALLMENT PLAN

Stages Payment
At the time of Registration of Application for Allotment 10% of BSP
Within 3 months of allotment 10%of BSP
On commencement of construction 10% of BSP + 50% of PLC
#On casting of Ground Floor Roof 10% BSP + 50% of PLC
On casting of Third Floor Roof 10% of BSP + 50% of CMRC
On casting of Sixth Floor Roof 7.5% of BSP + 50%OF Parking
On casting of Ninth Floor Roof 7.5% of BSP + 50% of Parking
On casting of Twelfth Floor Roof 7.5% of BSP
On casting of Top Floor Roof 7.5% of BSP
On completion of masonry work in the Apartment 5% of BSP
On completion of internal plastering in the Apartment 5% of BSP
On completion of flooring within Apartment 5% of BSP
On notice of possession 5% of BSP + 50% of CMRC+ Stamp Duty
Fees and any other charges as applicable
Other charges include Maintenance Security, Maintenance Charges, Stamp Duty Charges, Registration Fees and other charges payable as per agreed terms.
# This installment and installments listed hereunder shall become payable on demand irrespective of the serial order in which they are listed.
Specification
STRUCTURE
STRUCTURE EarthQuake resitent vROC Framed Structure
FLOORS
Living/Dining Vitrified tiles flooring
Lift lobby Stone/Vitrified Tiles
Bedrooms Laminated Wooden Floorings
Balcony Ceramic Tiles
Common Areas & Staircase Stone/Marble
Kitchen & Toilet Ceramic Tile Flooring
WALLS
External Exterior Paint
internal Plastic Emulsion Paint
Lift Lobby Combination of Stone & Paint
Kitchen Ceramic tiles upto 600mm height above the counter
Toilet Ceramic tiles upto 2100mm height
Lift
Lift One Passenger and one service lift to each tower
COUNTERS
Kitchens Granite counter with stainless steel sink with drain board
FITTINGS & FIXTURES
Toilets EWC & wash basin in white color, single lever CP fittings,granite counter,Pipeline for geyser
DOORS & WINDOWS
Internal Door Seasons hardwood frames with moulded European style shutters
External Door Anodized/ Powder coated glazed Aluminium doors
Main Door Seasons hardwood frames with moulded European style shutters
Windows Anodized/ Powder coated glazed Aluminium Windows
ELECTRICALS
Three Phase supply with independent meter, copper wiring in concealed conduits
Telephone

One Telephone jack in each living room and master bedroom,Intercom facility to each flat in living room

Television

TV points in each living room and master bedroom

Power back-up

24x7 Power back-up

 
E Brocher

Application Form

 
EMI
Area Conversion
 
Gurgaon Noida
Mohali Greater Noida
Encore Estate
 
Projects
DLF  EMAAR MGF UNITECH RAHEJA RAMPRASTHA VATIKA OTHER LUXURY APARTMENT
SamaTara Commonwealth Games    Village    2010  Nirvana Country 2 Shilas The Edge Towers  India Next BPTP Astaire Gardens
Capital Greens, Ph.- III The Palm Drive  Vistas Atharva The Atrium India Next
 (Bellevue Residences)
Ambience Caitriona
Capital Greens, Ph.- I Emerald Floors Premier Sunbreeze Vedanta The View City Homes IREO The Grand Arch
Capital Greens- II Emerald Estate The Residences Navodaya IREO Uptown
New Town Heights The Palm Springs Uniworld Garden II R Mall (Com)
Express Greens The Palm Square (Com) The Close
Park Place Digital Greens (Com) Fresco
The Belaire Palm Terraces Select Signature Tower - II       (Com)
The Magnolias
Home | About Us | Services | News Letter | Home Loan | FAQ's | Career | Bookmark us | Feedback | Contact Us | Disclaimer
Copyright © Sana Associates 2010