A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections. (provider: Named Pipes Provider, error: 40 - Could not open a connection to SQL Server)
BPTP Spacio
BPTP SpacioBPTP's SPACIO, Park Serene, Sector-37D, Gurgaon at an unbelievable price of Rs. 2650/- per sq ft. in Construction linked payment plan & at Rs 2795/ per sq ft....
 
Emaar MGF Palm Terrace Select
Palm Terrace SelectPalm Terraces Select, a part of the larger community of The Palm Drive is ideally located on the Golf Course Extension Road with easy access from the main road...
 
DLF Capital Greens-III
DLF Capital GreensAfter huge success of DLF Capital Greens Phase I & II, much awaited DLF Capital Greens Phase III is on anvil. ....
 
 
Residential Projects > UNITECH  Vistas, Gurgaon
Projects style
Premium Apartments
Location
Gurgaon
Projects Status
On booking process
 
 
Overview

Tone your soul to its natural rhythm
Presenting a heaven of space & serenity to get away from your worries.

  • Landscaped greens
  • Jogging & Walking tracks
  • Manicured gardens
  • Manned barriers at entry & exit
  • Intercom facility
 
AT the heart of it all and yet apart
Experience an array of leisurely activities surrounding your home
  • Swimming pool
  • Club House
  • Adjoining extensive green area
  • Schools
 
Loc map
Master Plan
Key Plan
Spec
STRUCTURE
Earthquake Resistant RCC Framed Structure
FLOORING
Living / Dining Vitirfied Tiles
Bedrooms Laminated Wooden Flooring
Balconies Ceramic Tiles
Comman Areas & Staircase Stone / Marble
Lift Lobby Stone /Vitrified Tiles
Domestic Help Room Ceramic Tiles
Wall / Ceiling
External Exterior Paint
Internal Plastic emulsion paint, Ceiling In OBD Domestic help Room/ Toilet in OBD
Lift Loby Combination of Stone & Paint
LIFT
One Passenger and One service lift to each Tower
KITCHEN
Flooring Ceramic Tiles
Wall Finishes Ceramic tiles upto 600mm hight above the counter area
Kitchen Counter Granite Counter With stainless steel sink with drain bord
DOORS
Internal Seasoned hardwood frames with moulded European style shutters
External Anodized / Power Coted glazed aluminium doors
Main Door Seasoned hardwood frames with moulded European Style Shutters
TOILET
Wall Ceramic Tiles upto 2100mm height
Flooring Ceramic Tiles
Fittings
EWC & Wash basin in white colour, single lever CP fitting, Granite counter pipelines for geyser
WINDOWS
Anodized / Powder coated glazed aluminium windows
COMUNICATION
One Telephone Jack each in living room and master bed room, Intercom facility to each flat in living room
TELEVISION
Tv point in living room and master bed room
POWER BACK UP
24X7 Power Back up
All Floorplans, Sitemap, specifications, amenities, facilities and Perspective views are tentative in nature and are subject to revision
Price
PRICES LIST
Basic Sale Price (BSP) for 1BR & 2BR Rs. 3325/- per sq. ft.
Basic Sale Price (BSP) for 3BR Rs. 3250/- per sq. ft.
External Development Charges Rs. 298/- per sq.ft.
Infrastructure Development Charges Rs. 33/- per sq. ft.
Preferential Location Charges (PLC)
  • Single PLC : Rs. 100/- per sq. ft.
  • Two PLCs : Rs. 175/- per sq. ft.
  • Three PLCs : Rs. 250/- per sq. ft.
PLCs shall be charged for the following units
  • Ground Floor
  • First Floor
  • Second Floor
  • Corner
  • Landscape Facing
Interest Free Maintenance Security Deposit Rs. 50/- per sq. ft.
Car Parking Space
  • Covered : Rs. 2,50,000/- per parking
  • Open : Rs. 1,50,000/- per parking
Club Membership Registration Charges Rs. 60,000/-
  1. Basic Price mentioned above are escalation free and exclusive of External Development Charges (EDC), Infrastructure Development Charges (IDC).
  2. Any further increase in EDC and IDC by the Statutory Authorities shall be borne by the Allottee.
  3. The Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super Area for any delay in offering possession of the Apartment beyond the period of 36 months from the date of execution of the agreement to sell. Similarly, the allottee(s) would also be liable to pay holding charges @ Rs. 5/- per sq. ft. per month of Super Area if the allottee(s) fails to take possession of the Apartment within 30 days from the date of issuance of the notice of possession.
  4. The Maintenance Charges on the basis of Super Area of the Apartment as determined by the Company at the time of offer of possession of the Apartment shall be payable in advance for a period of two years along with the notice of possession.
  5. One covered car parking space is mandatory, for each apartment.
  6. • One covered car parking space is mandatory, for each 1BR & 2BR apartment. One covered and one open car parking space is mandatory, for all 3BR apartment.
  7. The above Prices / Payment Plans are subject to revision/withdrawal at any time without notice at the sole discretion of the Company.
PAYMENT PLANS
DOWN PAYMENT PLAN (Rebate 10% on Basic Sale Price)
At the time of Registration of Application for 10% of BSP
Allotment  
Within 45 Days Of the date of Registration 85% of BSP +PLC + Parking + 50% of CMRC + EDC + IDC
On Notice Of Possession 5% of BSP + 50% of CMRC + Stamp duty charges and other charges as applicable
CONTRUCTION LINKED INSTALLMENT PLAN
At the time of Registration of Application for Allotment 10% of BSP
Within 75 days of allotment 10% of BSP
Within 150 days of allotment 10% of BSP
On commencement of construction 10% of BSP + 50% of PLC + 25% of EDC + IDC25% of
#On casting of Ground Floor Roof 10% BSP + 50% of PLC + 25% of EDC + 25% of IDC
On casting of Third Floor Roof 10% of BSP + 50% of CMRC + 25% of EDC + 25% of IDC
On casting of Sixth Floor Roof 5% of BSP + 50% of Parking + 25% of EDC + 25% of IDC
On casting of Ninth Floor Roof 5% of BSP  + 50% of Parking
On casting of Eleventh Floor Roof 5% of BSP
On casting of Top Floor Roof 5% of BSP
On completion of masonry work in the apartment 5% of BSP
On completion of internal plaster within the apartment 5% of BSP
On completion of flooring within apartment 5% of BSP
On notice of possession 5% of BSP + 50% of CMRC+ Stamp duty charges and any other charges as applicable
BSP = Basic Sale Price CMRC = Club Membership and Registration Charges
EDC = External Development Charges IDC = Infrastructure Development Charges
PLC = Preferential Location Charges  
  1. Other charges include Maintenance Security, Maintenance Charges, Stamp Duty Charges, Registration Fees and other charges payable as per the agreed terms
  2. This installment and installments listed hereunder shall become payable on demand irrespective of the serial order in which they are listed
E-Bro
App Form
 
EMI
Area Conversion
 
Gurgaon Noida
Mohali Greater Noida
Encore Estate
 
Projects
DLF  EMAAR MGF UNITECH RAHEJA RAMPRASTHA VATIKA OTHER LUXURY APARTMENT
SamaTara Commonwealth Games    Village    2010  Nirvana Country 2 Shilas The Edge Towers  India Next BPTP Astaire Gardens
Capital Greens, Ph.- III The Palm Drive  Vistas Atharva The Atrium India Next
 (Bellevue Residences)
Ambience Caitriona
Capital Greens, Ph.- I Emerald Floors Premier Sunbreeze Vedanta The View City Homes IREO The Grand Arch
Capital Greens- II Emerald Estate The Residences Navodaya IREO Uptown
New Town Heights The Palm Springs Uniworld Garden II R Mall (Com)
Express Greens The Palm Square (Com) The Close
Park Place Digital Greens (Com) Fresco
The Belaire Palm Terraces Select Signature Tower - II       (Com)
The Magnolias
Home | About Us | Services | News Letter | Home Loan | FAQ's | Career | Bookmark us | Feedback | Contact Us | Disclaimer
Copyright © Sana Associates 2010